You are here: Members » Sadik Saygi
INORE in Numbers
Today a total of 488 INOREans and 505 webmembers are on the same mission: To realize the power of offshore renewable energy!

> 993 members

> 156 women and 837 men

> From 69 countries

Sadik Saygi
About me
mask
First name
Sadik
Last name
Saygi
Gender
Male
City
Lisbon
Country
Portugal
Work information
Title
Assessing the Economics of Offshore Renewable Energies and Portuguese Supply Chain
Position
Other
Research focus
A 100 MW offshore floating wind farm (WindFloat) and a 100 MW wave energy converter farm (Pelamis) are modelled in the Pilot Zone in Portugal. Cost break-downs of the offshore renewable farms were obtained through disaggregation of each project phases into item`s level. The CAPEX of two farms were estimated and analyzed the distribution to the phases. PM (scheduling, sequence, resource allocation) of the WindFloat farm was achieved. Supply chain and value chain analysis of two reference farms were obtained through making interviews with Portuguese entities and an input-output matrix model. In conclusion, the output of the study was to understand what the Portuguese supply chain capability is in Offshore Renewable Energy sector and also to predict what the economic impact of installing an offshore renewable farm could be to national economy (GVA and Employment Analysis).
WIKI Articles

Inore Symposium 2012 Application 1 Slide (2012-02-14)


Inore Symposium 2012 Application 1 Slide

Assessing the Economics of Offshore Renewable Energies and Portuguese Supply Chain. (2012-02-10)

A 100 MW offshore floating wind farm (WindFloat) and a 100 MW wave energy converter farm (Pelamis) are modelled in the Pilot Zone in Portugal. Cost...




Login to see the full profile - or register here

bottom